What We Do

Services

Here's the full rundown of what we handle, from framing to the finish coat.

Home › Services

Everything we take on

Every job below is one we do ourselves across Buffalo Grove.

Deck Installation

We dig footings below the frost line, usually around 42 inches here, and bolt the ledger board into the rim joist with proper flashing so water doesn't track back into your house. Joists go in at 16 inches on center under pressure-treated or composite decking. Most single-level decks take one to two weeks from the first footing to the last board.

Deck Repair

A bouncy spot near the stairs is usually a joist that's rotted where it meets the ledger, not something you fix by tightening a screw. We also deal with rusted joist hangers, wobbly posts, and railings that have worked loose from age and weather. Some repairs take an afternoon, others mean pulling up half the decking to get at what's underneath.

Deck Staining & Sealing

Gray, splintery wood usually just means the old finish has worn off, not that the deck needs rebuilding. We pressure wash first, let it dry a couple days, then strip any remaining old stain before applying a fresh oil-based or water-based finish. Plan to recoat every two to three years, sooner if the deck gets full sun all day.

Custom Deck Design

If you want built-in benches, a pergola over part of the deck, or stairs down to a lower patio, we'll draw it out before anyone picks up a saw. We work around what's already in your yard, slope, trees, drainage, instead of forcing a standard rectangle onto it.

Composite Decking Installation

Composite boards like Trex or TimberTech go down with hidden fastener clips instead of face screws, so the surface stays clean. They don't splinter, rot, or gray in the sun, and they skip the staining step entirely. The framing underneath is still pressure-treated lumber, composite is a surface material, not a structural one.

Deck Railing Repair & Installation

Code around here calls for balusters spaced no more than 4 inches apart, and plenty of older decks don't meet that anymore. We'll rebuild a railing from scratch in wood, aluminum, or cable, or just reset the posts and tighten what's loose if the rest is sound.

Deck Resurfacing

If the frame underneath is still solid, a full rebuild isn't necessary, just new decking boards and railings on top of what's there. We check the joists and footings first, because resurfacing over a bad frame only hides the problem for a year or two. It's usually faster and cheaper than tearing everything out.

Deck Demolition & Removal

Old decks come down board by board or in sections, depending on how rotted the frame is and what's safe to pull apart by hand. We haul away all the scrap lumber and check the existing footings to see if they're deep enough and solid enough to build on again.

Pergolas & Deck Shade Structures

A pergola attached to an existing deck gives you shade over the part you actually sit in without covering the whole thing. Posts get set in concrete and tied into the deck framing, not just screwed to the surface decking, so it holds up in wind.

Multi-Level Deck Building

Yards that slope call for stairs and landings between deck levels, which means extra stringers and framing beyond a standard single-level build. We plan the rise and run of every stair section so it meets code and doesn't feel awkward to walk down after dark.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Buffalo Grove, IL

This is the general radius we cover for deck jobs, give us a call if your town isn't listed.

Buffalo Grove, IL
Arlington Heights, IL
Schaumburg, IL
Evanston, IL
Waukegan, IL
Elgin, IL
Skokie, IL
Des Plaines, IL
Wheeling, IL
Mount Prospect, IL
Vernon Hills, IL
Northbrook, IL
Common Questions

Things worth asking

Questions that come up once a deck project is actually underway.

Is a permit required to build a deck?
Most suburbs around Buffalo Grove, IL require a building permit for any deck more than 30 inches above grade, and some require one regardless of height. The permit process typically involves submitting a site plan and framing details, then scheduling a footing inspection before the decking goes on. Skipping a required permit can cause problems later when selling the house, since it may show up in a title search or appraisal.
How long does a typical deck build take?
A standard single-level deck between 200 and 400 square feet usually takes one to two weeks from the first footing dig to the final board, weather permitting. Multi-level decks, built-in benches, or custom stair layouts can add several days to a week. Permit approval and inspection scheduling often take longer than the actual construction.
Can a deck be built to fit a specific budget?
Yes, deck size, footing count, and material grade can all be adjusted to hit a target budget without cutting corners on structural safety. Pressure-treated pine framing with composite decking on top, for example, balances upfront cost against long-term upkeep better than an all-composite build. A contractor should be able to show how each change to size or material shifts the number.
What kind of guarantee comes with deck construction?
Reputable deck builders offer a workmanship warranty, typically one to five years, covering framing and construction defects separate from the manufacturer's warranty on the decking material itself. Composite decking brands like Trex or TimberTech often carry 25 to 50 year material warranties against fading and staining. It's worth getting both warranties in writing before the final payment.
Who handles day-to-day questions once a deck project starts?
On most deck jobs, one crew lead or project manager serves as the main point of contact for schedule updates, material questions, and any changes that come up mid-project. That person should be reachable by phone or text throughout the build, not just at the estimate and final walkthrough. Clear day-to-day contact matters most during footing inspections and when weather forces a schedule change.
What materials are used for deck framing versus the deck boards?
Deck framing, meaning the joists, beams, and posts, is almost always pressure-treated pine rated for ground contact, since it has to resist rot and insects for decades underground and under the structure. The decking boards on top can be pressure-treated wood, cedar, or composite materials like Trex and TimberTech, each with different costs and different amounts of upkeep. Railings can match the decking material or use aluminum, cable, or glass panels for a different look.
Can the yard still be used while a deck is being built?
Most of the yard remains usable during a deck build, though the immediate work area will have tools, lumber, and a trailer parked nearby for the duration. Pets and kids should stay clear of the footing holes and any area with exposed nails or saws running. Access to a side gate or driveway for material delivery is usually the only real disruption to day-to-day yard use.
How should the yard be prepared before a deck crew arrives?
Clearing furniture, grills, and potted plants away from the existing deck or build area speeds up the first day significantly. Marking the location of any underground sprinkler lines, invisible dog fences, or shallow utility lines helps avoid damage during footing digs. Calling 811 for a utility locate before any digging is standard practice and sometimes required by local permit offices.
What happens if rotted wood or a bad footing turns up mid-project?
Hidden rot at a ledger board or a footing that's shallower than code requires is fairly common on older decks once the old decking comes off, and it usually means a change order to the original quote. A contractor should stop and explain the issue, the fix, and the added cost before proceeding rather than just building over the problem. This is more common on tear-out and rebuild jobs than on brand-new construction on undisturbed ground.
How should a new deck be maintained once it's finished?
Pressure-treated or cedar decking should be cleaned and resealed every two to three years, with a water-beading test, pour a cup of water on the boards in spring to check if it's time. Composite decking needs just an occasional soap-and-water wash since it doesn't absorb water or need staining. Keeping planters and grills off any decking material for long periods prevents moisture staining and heat marks.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (847) 440-3426